GOLF COURSE CONSTRUCTION UPDATE
Construction of the Lonnie Poole Golf Course is well underway and a March 2009 completion is anticipated.
View a pictorial journal of the journey to completion below.
AERIAL AS OF 05-17-08 |
 |
 |
|
|
|
AS OF 04-14-08 |
 |
 |
 |
 |
 |
Driving Range |
Pond Outfall |
PH Panel |
Dam Repair |
PH |
 |
 |
 |
 |
 |
#1 From Bend |
#2 Green |
#3 From Back Tees |
#4 Green |
#6 Green |
 |
 |
 |
 |
 |
#7 From Fairway |
#8 Green |
#9 Green |
#10 From Back Tees |
#11 At Bend |
 |
 |
 |
 |
 |
#11 From Back Tees |
#11 Bunkers |
#11 From Fairway |
#12 From Back Tees |
#12 Green |
 |
 |
 |
 |
 |
#13 Bunkers |
#13 From Fairway |
#13 Green |
#14 Green |
#14 Valves at Tee |
 |
 |
 |
 |
 |
#15 From Fairway |
#15 Approach |
#15 Pond Seeding |
#16 From Back Tee |
#16 Green |
 |
 |
|
|
|
#17 Green |
#18 Green |
|
|
|
AS OF 03-08-08 |
 |
 |
 |
 |
 |
Newly Installed Cart
Path Approaching
#11 Green |
Irrigation Installation
on Hole #13 |
Forms Being Set
for Cart Path |
Green #17 with
Drainage and Gravel
Layer Installed |
Green #13 with
Drainage and Gravel
Layer Installed |
 |
|
|
|
|
View of #12 Green
with Drainage and
Gravel Layer In |
|
|
|
|
AERIAL AS OF 02-20-08 - Photo By: Photography, Ink |
 |
|
|
|
|
AS OF 01-06-08 |
 |
 |
 |
 |
 |